EMHA DESIGN REVIEW PROCESS WEAPONIZED AGAINST HOMEOWNER X

233 Avenida Mirador Design Review Request Drawing.

EMHA has a design review process that is supposed to be fairly applied among all homeowners making requests.

After this website has been completed, each reader will have an opportunity to determine if the El Mirador Homeowners Association, Inc., its Board of Directors and Design Review Committee have treated everyone similarly, or if, as Homeowner X insists, they have discriminated and harassed a single family living among the group of 94 existing homes within the subdivision.


The Covenants describe a Design Review Process

Design Review Requests are typically not complicated, and are mostly approved with little consideration by EMHA. This can be evidenced by Henry Trost's claim of 100% approval for 2020, when the Design Review Committee had fewer people than required by the Covenants for most of the year. Trost must have approved many applications by himself in 2020, in direct violation of EMHA rules. Trost also claimed a 100% approval rate for 2021.

Homeowner X contends that the Association does not engage in a fair and honest design review process for all applicants.

229 Avenida Mirador Design Review Request Drawing.
229 AVENIDA MIRADOR DESIGN REVIEW REQUEST DRAWING. THIS REQUEST WAS APPROVED WITHIN 6 DAYS OF SUBMISSION.
233 Avenida Mirador Design Review Request Drawing.
233 AVENIDA MIRADOR DESIGN REVIEW REQUEST DRAWING. THIS REQUEST WAS "DISAPPROVED PENDING," AN OUTCOME THAT DOES NOT EXIST WITHIN THE COVENANTS OR DESIGN REVIEW GUIDELINES. 36 MONTHS LATER IT IS STILL IN LIMBO.
233 Avenida Mirador Design Review Request.
233 AVENIDA MIRADOR DESIGN REVIEW REQUEST. NOTE THE "DISAPPROVED PENDING" WRITTEN AT THE BOTTOM, AND THAT THE DATE RECEIVED SHOWS AUGUST 29, 2019, WHEN IT WAS SUBMITTED JULY 18, 2019.


This unsigned letter was sent by the EMHA Design Review Committee regarding the 233 Avenida Mirador Design Review Request.
THIS UNSIGNED LETTER WAS SENT BY THE EMHA DESIGN REVIEW COMMITTEE REGARDING THE 233 AVENIDA MIRADOR DESIGN REVIEW REQUEST.
EMHA Design Review Guidelines, page 8, Section 3. Design Review Procedures.
EMHA DESIGN REVIEW GUIDELINES, PAGE 8, SECTION 3. DESIGN REVIEW PROCEDURES.